Passed · 2026-06-03

EcoHubs Invariants Register

Adopts six invariants (INV-001 to INV-006) that may not be overridden by any decision, role, process, or emergency measure while they are in force.

Decision type
constitutional
Layers affected
L0
Vote
Supermajority (≥⅔ of votes cast) met

  • Status: Passed
  • Submitted: 2026-05-05
  • Submitted by: Stefan (founding member)
  • Decision type: Constitutional
  • Authorized decision path: Decision Matrix (Layer 2) — “Primary purpose, scope, invariant, or identity constraint changes” → Constitutional; all Full Members; ecohubsOS vote + 30-day ratification; supermajority (≥⅔)

Summary

Adopts six invariants as the hard floor of the EcoHubs governance system. While in force, no decision, role, process, or emergency measure may override them; where an invariant conflicts with any other rule, the invariant prevails.

Affected Layers and Artifacts

  • Layer 0 — layers/0-identity/03-invariants-register.md

Change Type

  • Permanent rule change
  • Time-bounded experiment

Adopted Content

Active Invariants

IDInvariant
INV-001The primary purpose may never be overridden by any operational or strategic decision, role, or emergency measure.
INV-002Authority must always be explicit and traceable to the governance system — no person or role may hold or exercise undeclared authority.
INV-003Exit from the community must always be possible and must never be blocked, penalised, or made conditional beyond what is defined in Layer 1.
INV-004The structural layer must remain non-ideological — no belief system, culture, or ideology may be embedded as a requirement in RCOS Core or EcoHubs governance.
INV-005EcoHubs may never be used as a vehicle for speculative financial gain or extraction from its members.
INV-006Physical, psychological, and child safety always override participation rights, role continuity, and reputational concerns.

Rationale

RCOS-Core §2.3 requires invariants that cannot be overridden while in force. Rules that can be suspended under pressure are preferences, not constraints — and a governance system is only trustworthy if some things hold on its worst day, not just its calm ones. These six bind the purpose (INV-001), authority (INV-002), exit (INV-003), non-ideology (INV-004), non-extraction (INV-005), and safety (INV-006) across every layer.

Risks and Mitigations

  • Risk: An invariant proves unworkable and cannot be quickly relaxed. Mitigation: Invariants can be changed by Constitutional decision; the difficulty is intentional and bounded, not absolute.
  • Risk: INV-006 (safety overrides) could be invoked to bypass due process. Mitigation: The Accountability Protocol and Conflict Resolution Ladder (Layer 4) define the process by which safety concerns are raised and handled, including anti-retaliation provisions.

Transition and Migration Plan

No migration required. Status changes from Stub — not yet adopted to Active — adopted 2026-07-03. All six invariants take effect on the effective date and are recorded in the register with that date.

Rollback Plan

Rollback requires a further Constitutional decision removing or amending specific invariants. Rollback trigger: a ratified finding that an invariant is unenforceable or in irreconcilable conflict with the primary purpose.

Effective Date

2026-07-03 (end of the 30-day ratification period following the vote close)

Review Date (if experiment or time-bounded)

N/A


Decision Record

  • Vote outcome: Passed
  • Proposal created: 2026-05-05 10:16
  • Vote closed: 2026-06-03 10:16
  • Ratification period: 30 days from vote close, per Decision Matrix (Layer 2)
  • Effective / adopted: 2026-07-03
  • Decision type: Constitutional
  • Mechanism: ecohubsOS vote
  • Decision record: /proposals/passed/2026-05-05_invariants-register
  • Signatories / vote count: Supermajority (≥⅔ of votes cast) met; per-member tally recorded on the ecohubsOS proposal page

← All passed proposals